• Lean Unit 4: The Last Planner® System - March 11 - Online and Live

    • Share:
    Name: Lean Unit 4: The Last Planner® System - March 11 - Online and Live
    Date: March 11, 2021
    Time: 7:00 AM - 11:00 AM MST
    Registration: Register Now
    Event Description:
    Lean Unit 4: The Last Planner® System is the second of two units introducing the Last Planner System (LPS).  This system was developed by the Lean Construction Institute (LCI) to plan projects in a way that produces predictable workflow and rapid learning.  This half-day, facilitator-led course shows how to conduct make-ready and weekly work planning sessions.  Following this course, students students will be able to:

    Apply the Last Planner System on a project
    Hold make-ready and weekly work planning sessions
    Calculate, track and analyze percent plan complete for a project

    About the Lean Construction Education Program (LCEP):
    Lean Construction is based on the holistic pursuit to optimize efficiency, maximize value, and minimize costs through all phases of a construction project: planning, design, construction, activation, operations, maintenance, salvaging, and recycling.  Everyone related to the construction process has an incentive to get the project done faster and at a lower cost - from the project owners who want to see tangible results for their investment to the contractors and designers who want to do their job well and move on to the next project.

    AGC of America developed the 7-unit Lean Construction Education Program (LCEP) to help contractors develop the knowledge needed to build projects using Lean practices.  Construction professionals at all experience levels will learn the building blocks necessary to transform their projects and companies into a Lean operating system.  

     
    Location:
    A Zoom link will be provided prior to the event.
    Date/Time Information:
    Thursday, March 11
    7:00am - 11:00am

     
    Contact Information:
    303.388.2422
    Fees/Admission:
    AGC Member / $300
    Non-Member / $400
    Registration fee includes textbook.

    For non-member registration please contact Cathy Bedell at cathy@agccolorado.org.

    15% discount when registering for all 7 units.  Please contact Cathy Bedell at cathy@agccolorado.org for more information.
    Set a Reminder:
    Enter your email address below to receive a reminder message.
  • Upcoming Events

     
  •