• Lean Unit 4: The Last Planner® System (11/08/2019)

    • Share:
    •  
    Name: Lean Unit 4: The Last Planner® System (11/08/2019)
    Date: November 8, 2019
    Time: 1:00 PM - 5:00 PM MST
    Registration: Sorry, public registration for this event has been closed.
    Event Description:

    Lean Unit 4: The Last Planner® System is the second of two units introducing the Last Planner® System (LPS). This system was developed by the Lean Construction Institute (LCI) to plan projects in a way that produces predictable workflow and rapid learning. This half-day, facilitator-led course shows how to conduct make-ready and weekly work planning sessions. Following this course, students will be able to: 

    • Apply the Last Planner® System on a project;
    • Hold make-ready and weekly work planning sessions;
    • Calculate, track and analyze percent plan complete for a project
    About the Lean Construction Education Program (LCEP)
    Lean Construction is based on the holistic pursuit to optimize efficiency, maximize value, and minimize costs through all phases of a construction project: planning, design, construction, activation, operations, maintenance, salvaging, and recycling.  Everyone related to the construction process has an incentive to get the project done faster and at a lower cost - from the project owners who want to see tangible results for their investment, to the contractors and designers who want to do their job well and move on to the next project. 

    AGC of America developed the 7-unit Lean Construction Education Program (LCEP) to help contractors develop the knowledge needed to build projects using Lean practices. Construction professionals at all experience levels will learn the building blocks necessary to transform their projects and companies into a Lean operating system.
    Location:
    AGC Training Center
    686 Mariposa Street
    Denver, CO 80204
    Date/Time Information:
    1pm - 5pm
     
    Contact Information:
    303.388.2422
    Fees/Admission:
    members $300
    non-members $400
    Professional Development Hours:
    4
    Set a Reminder:
    Enter your email address below to receive a reminder message.
  • Upcoming Events