-
Lean Unit 3: Workstructuring & Lean Unit 4: The Last Planner® System (11/6/20)
Lean Units 3 & 4
Lean Unit 3: Lean Workstructuring is the first of two units that introduces the Last Planner® System (LPS). This system was developed by the Lean Construction Institute (LCI) to plan projects in a way that produces predictable workflow and rapid learning. This half-day, instructor-led course describes the process of Lean Workstructuring. Following this course, students will be able to:- Apply the methods and tools utilized in pull planning
- Describe the concept of Lean Workstructuring
- Outline the desired outcomes of Lean Workstructuring
- Describe the characteristics and application of the Last Planner® System
Lean Unit 4: The Last Planner® System is the second of two units introducing the Last Planner® System (LPS). This system was developed by the Lean Construction Institute (LCI) to plan projects in a way that produces predictable workflow and rapid learning. This half-day, facilitator-led course shows how to conduct make-ready and weekly work planning sessions. Following this course, students will be able to:- Apply the Last Planner® System on a project;
- Hold make-ready and weekly work planning sessions;
- Calculate, track and analyze percent plan complete for a project
Lean Construction is based on the holistic pursuit to optimize efficiency, maximize value, and minimize costs through all phases of a construction project: planning, design, construction, activation, operations, maintenance, salvaging, and recycling. Everyone related to the construction process has an incentive to get the project done faster and at a lower cost - from the project owners who want to see tangible results for their investment, to the contractors and designers who want to do their job well and move on to the next project.
AGC of America developed the 7-unit Lean Construction Education Program (LCEP) to help contractors develop the knowledge needed to build projects using Lean practices. Construction professionals at all experience levels will learn the building blocks necessary to transform their projects and companies into a Lean operating system.
Lean Unit 3: Workstructuring & Lean ...Date and Time
Friday Nov 6, 2020
8:00 AM - 5:00 PM MSTFriday, November 6, 2020
8am - 5pm
Location
AGC Training Center
686 Mariposa Street
Denver, CO 80204Fees/Admission
members $600
non-members $800Website
Contact Information
303.388.2422
Send EmailTell a Friend